Polyurethane resin filler material - List of Manufacturers, Suppliers, Companies and Products

Polyurethane resin filler material Product List

1~4 item / All 4 items

Displayed results

[Construction Case] Industrial Waste Factory: Floor Slab Void Filling Work

The impact of weak ground! Introducing a case where 100% filling without gaps eliminated voids and cavities under the floor.

We would like to introduce a case of "filling voids and cavities under the concrete floor" carried out at a waste disposal facility in Chiba Prefecture. Due to the influence of weak ground, the ground subsided, creating large voids under the concrete floor. We injected polyurethane resin under the concrete to fill the voids. After construction, it can be visually confirmed that polyurethane resin has been filled directly beneath the areas where the concrete floor was excavated. [Case Overview] - Construction Area: Approximately 710m² - Maximum Void: 180mm - Area: Chiba Prefecture - Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Nursing Facility South Building: Underfloor Void (Cavity) Filling Work

Due to weak ground, ground subsidence! Only the ground is sinking, creating gaps under various floors within the building.

We would like to introduce a case of "subfloor void filling work" carried out at a nursing facility located in Shizuoka Prefecture. Due to weak ground, ground subsidence was occurring, causing the ground to sink while voids were observed under various areas of the building's floor. We conducted filling work using polyurethane resin to fill the voids beneath the floor slab, successfully eliminating the voids. 【Case Summary】 ■ Construction Area: Approximately 250m2 ■ Location: Nursing facility in Shizuoka Prefecture ■ Construction Period: 3 days *For more detailed information about this case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Precision Sheet Metal Processing Factory: Underfloor Void and Cavity Filling Work

Vibration suppression for new machine installation! A case of filling the ground floor under the concrete slab without gaps in a short construction period.

We would like to introduce a case of "filling voids and cavities under the concrete floor and vibration mitigation work" carried out at a precision sheet metal processing factory located in Yamagata Prefecture. This client is a repeat customer for whom we performed void and cavity filling work in 2017. This time, the request was for filling voids and cavities under the concrete floor and stabilizing the ground as a vibration mitigation measure for the installation of new machinery within the factory. Before the work, the void volume was 70mm, and after the work, there were no voids. We confirmed through CCD camera inspection that the polyurethane resin was densely filled, and the work was completed. 【Case Overview】 ■ Construction Area: 432m2 ■ Maximum Void Volume: 70mm ■ Area: Yamagata Prefecture ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Power Company Substation: Void (Cavity) Filling Work

The foamed urethane resin compressively strengthens the ground! It suppresses the occurrence of voids, cavities, and gaps after construction.

We would like to introduce a case of "void (cavity) filling work" carried out at a power company substation in Hokkaido. During the renovation work of the building, voids were observed under the concrete floor, leading to a request for void (cavity) filling as a preventive measure against potential issues before installing heavy machinery. The urethane resin injection work was carried out while confirming the height with a laser level, and it was confirmed that the urethane resin was densely filled, completing the construction. 【Case Overview】 ■ Construction Area: 57m² ■ Maximum Void Volume: 100mm ■ Area: Hokkaido / Power Company Substation ■ Construction Period: 1 day *For more details about the case, you can view them through the related links. For more information, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration